和我们聊天,由 LiveChat 提供支持

Olympic Facility Construction: Bringing Home Olympic Gold since 1976

Sport Image: Curling

Olympic Facility Construction: Bringing Home Olympic Gold since 1976

Posted on February 9, 2018

Olympic Sports, Speed and Solutions

The arena is filled to the brim with athletes, judges, family and friends. Every person in the audience exudes an undying pride for their country. The Olympic Games captures the world’s attention with spectacular sights, sounds and athletic ability.

When Olympic athletes are performing on their mat, mountain or track, the magnitude of the facilities that pop up across the world almost goes unnoticed.

While these athletes are preparing their minds and bodies to achieve peak condition, Olympic committees are facing tight deadlines to design and build world-class sporting venues to welcome them onto their stage. Behind the scenes, the Games begin before a single Olympian sets foot on the field or a ski in the snow, as nations compete for the title of Olympic host. Countries face off for an opportunity to win this combination of capital projects, a tourism boost and a chance to showcase their home to spectators visiting from more than 200 countries across the globe.

Speed of Installation

Vancouver Convention Centre is one of the largest convention centers in Canada, serving as the international broadcast center for the 2010 Olympic and Paralympic Winter Games. On-time completion of this project was paramount, which was why contractors Fred Welsh and Alpha Mechanical chose Victaulic’s AGS system and QuickVic™ Installation-Ready™ couplings.

The 100,000 seat Sydney Olympic Stadium in Australia was designed to be the centerpiece of the Summer Olympic Games in 2000. Victaulic products were specified on all the hot water, chilled water and fire protection systems throughout this premier venue to help compress the construction schedule and reduce the project calendar days.

Original Solutions

The Bird’s Nest, home to the opening and closing ceremonies of the 29th Summer Olympic Games hosted in Beijing, China, boasted a sustainable yet challenging design—symbolizing a new page in China’s construction history. To accommodate the HVAC infrastructure in one of the world’s most highly active seismic areas, Victaulic flexible pipe joining solutions were selected.  Featuring 110,000 tons of curved steel, the National Stadium remains one of the most impressive architectural feats with its retractable roof.

A Track Record of Innovation

From Athens to Atlanta, Victaulic solutions have a proven record of successful Olympic facility construction. Since 1976, more than 25 Olympic facilities to date have used grooved products for HVAC, fire protection systems and other applications, including the following Games:

 

Victaulic(唯特利)

Victaulic(唯特利)

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Victaulic Style 177N QuickVic™ Installation-Ready™ grooved coupling- pipe joining advancement

Edison Awards Honor Victaulic Pipe-Joining Advancement

Victaulic has been recognized for their pipe joining advancement. Selected as the 2015 Edison Awards Industrial Design bronze award winner for the ...

Stainless Steel Fittings for Large-Diameter Piping Systems - Victaulic AGS

Victaulic Introduces AGS Stainless Steel Fittings for Large-Diameter Piping Systems

Victaulic has introduced AGS stainless steel fittings for large-diameter pipe giving customers the ability to build large-diameter grooved mechanic...

NASA tests Victaulic couplings ability to dampen and withstand vibration at their specialized Vibration & Acoustics Test Facility (VATF) at the Johnson Space Center in Houston, Texas.

NASA Puts Victaulic Couplings to the Test at Launch Pad & Vibration Lab

NASA tests how Victaulic flexible couplings handle piping systems vibration. Post includes results such as dampening & reduction capabilities stats.

Recent posts

Large Pipe Retrofitting Job - Victaulic Best Practices - Tip Four

The Top Six Mechanical Retrofitting Best Practices – Tip Four

Interested in mechanical retrofitting best practices? Learn about the top six here here. Tip 4: Maximize Jobsite Productivity.

CSE 2019 Product of the Year - two Victaulic products are fiinalists

Victaulic Named Two-Time 2019 CSE Product of the Year Finalist

Starting now through Friday, June 28, CSE magazine subscribers can vote for their favorites and the 2019 winners. Click to view Victaulic’s finalists.

Mercedes Benz Stadium, Atlanta GA - Victaulic Innovative Piping Solutions

Innovative Piping Solutions Win Big at Mercedes-Benz Stadium

Victaulic innovative stadium piping solutions helped Tebarco Mechanical accommodate tight timelines and unique architecture at Mercedes-Benz Stadium.