和我们聊天,由 LiveChat 提供支持

There’s No “I” in BIM

Pipe System BIM

There’s No “I” in BIM

Posted on May 2, 2016

Actually there is and unfortunately it’s sometimes an afterthought.      

In today’s B.I.M. arena, along with dimensional accuracy of content, there is a host of other data that should be represented in your content. For instance one of the software packages I deal with on a daily basis is Autodesk® Fabrication CADmep. The dimensional aspect is only a small percentage of the complete data rich content. Some other elements are pricing, material, labor, connectivity, insulation specifications, hanger specifications… etc. You’re not dealing with pretty pictures anymore. If you truly want to practice B.I.M., you had better make sure the “I” (information) is represented as well.

 

It may take more time upfront, gathering the necessary data to complete the content, but in the end you’ll be rewarded with a data rich model that not only looks great but also provides a wealth of information regarding estimating, ordering, construction and eventually maintenance.

Keep plugging away!

 

 

Ralph Schoch

Ralph Schoch

Ralph is the Revit, Technology, and Internal Support Manager and a 20-year veteran with the Virtual Design and Construction (VDC) team at Victaulic. For 16 years Ralph has been developing 3D piping system layouts. His interest in 3D modeling led him to begin developing for Revit in 2009. Ralph leads a team of people developing Revit families that allow engineers and contractors to design piping systems within Revit using Victaulic products. These families have been used around the world from engineering to construction with full fabrication from the Revit model. In addition to Revit, Ralph has experience in Navisworks, Fabrication CADmep, Inventor, Solidworks, and Bentley Autoplant. He is a board member for the Lehigh Valley BIM Professionals Group and is a member of Autodesk Developers Network and Professional Member of AUGI. Ralph holds an Associate’s Degree in Mechanical Drafting and Design.

Related posts

Building Better with BIM & Victaulic Prefabrication Piping Services Team

Building Better with BIM & Victaulic Prefabrication Piping Services Team

Jeff Leighton, Victaulic CPS BIM Manager, shares insights on how BIM Coordination & prefabrication piping systems can drive job site productivity a...

Victaulic Virtual Design & Construction Software - Create Assembly

Piping System Design In Half The Time With Victaulic Tools For Revit

Victaulic® Tools For Revit® are a set of routing and fabrication tools for Autodesk® Revit MEP® designed by Victaulic to increase productivity & cr...

Victaulic Tools for Revit - Add-in for Autodesk® Revit® MEP

Victaulic Launches Add-in for Autodesk® Revit® MEP

Victaulic introduces Victaulic Tools for Revit, an innovative add-in for Autodesk® Revit® MEP that allows users to route pipe twice as fast & incre...

Recent posts

HDPE Couplings Rescue a Landfill’s Failed Fusion Welds

Gas is extracted using vertical wells and a vacuum system and transported to the gas-to-energy plant via HDPE pipe before being converted into power.

Retrofit Piping Systems with Victaulic Mechanical Joining Products

The Top Six Mechanical Retrofitting Best Practices – Tip Five

Interested in the top six mechanical retrofitting best practices? Tip 5: Implement Modular Mechanical Room to Improve System Efficiency.

Large Pipe Retrofitting Job - Victaulic Best Practices - Tip Four

The Top Six Mechanical Retrofitting Best Practices – Tip Four

Interested in mechanical retrofitting best practices? Learn about the top six here here. Tip 4: Maximize Jobsite Productivity.