更短的施工周期
Victaulic(唯特利)沟槽管道连接的安装速度能够比传统方法(如焊接、螺纹焊接、熔接和锡焊等)快达10倍。

什么是沟槽管道系统?
A grooved piping system is a fast, clean, safe, and dependable way of joining pipe as opposed to welding, threading, flanging and soldering. Traditionally, grooves are rolled or cut into the ends of the pipe on the job or in the fab shop while fittings, valves and other components are manufactured with the same groove profiles. Until recently, the pipe, fittings and other piping components were all joined using grooved mechanical couplings. Click here for more information on Victaulic's Grooved Technology
Now, with the introduction of Victaulic's Installation-Ready™ line of fittings, in some applications, pipe can be joined with just a fitting. See Victaulic's line of Installation-Ready™ fittings for Copper or our FireLock™ Installation-Ready™ fittings.
沟槽接头所需的安装时间与焊接所需的对比?
标准沟槽管道接头安装起来比焊接快 5 倍,比法兰快 3 倍。但如果使用 Victaulic(唯特利)的沟槽管道产品,则安装速度能够比其他连接方法快 10 倍之多。Victaulic(唯特利)之所以能够帮助客户实现便捷的安装,是近 100 年来不断创新、重视客户需求的结果。已取得专利的 Installation-Ready 产品线就是一个完美的例子,表明 Victaulic(唯特利)如何致力于针对客户缩短项目工期的需求,为他们设计、开发和提供最合适的产品,从而节省其现场作业时间和运行成本。