奥西斯科马拉蒂克金矿

Three slurry pumping systems utilizing Victaulic AGS couplings
Wastewater Icon

项目概况

项目类型:
金矿
业主:

Osisko Mining Corporation

顾问公司设计院:

BBA Engineering

承包商:

Blais Industries、Construction Promec、Moreau Industries

管道材料:

碳钢,橡胶内衬

管道尺寸:

1 - 54"

位置:

加拿大魁北克马拉蒂克

解决方案:

  • Speed of Installation
  • 安装便捷
  • 可靠性好

On May 31, 2011, Osisko Mining Corporation, a leader in exploration and mining in Quebec, inaugurated the Canadian Malartic gold mine, a large-scale open-pit mine located in Malartic, Abitibi. Osisko estimates it will extract more than 9 million ounces of gold from now until 2027.

Osisko chose to partner with Victaulic system solutions on applicable systems within the mine. A major component of this project was the need to reliably join large diameter systems up to 54″/1300mm. The Victaulic Advanced Groove System (AGS) was selected as the ideal application to meet the demanding requirements of this job for its strength and ease of installation. Victaulic AGS couplings provided streamlined and easy installation while allowing for visual inspection of the proper joint assembly. These benefits were realized on the process water and chemical systems, along with the rubber-lined pipe use in slurry applications.

Victaulic system solutions maximized onsite installation schedules while mitigating risk on the process air, process water, and chemical systems. Victaulic also provided fire protection solutions throughout the mine. Partnering with Victaulic enabled Osisko to meet their demanding construction timeline and increased onsite safety throughout the installation.

项目类型:
金矿
Wastewater Icon
业主:

Osisko Mining Corporation

顾问公司设计院:

BBA Engineering

管道材料:

碳钢,橡胶内衬

位置:

加拿大魁北克马拉蒂克

承包商:

Blais Industries、Construction Promec、Moreau Industries

管道尺寸:

1 - 54"

解决方案:

  • Speed of Installation
  • 安装便捷
  • 可靠性好

On May 31, 2011, Osisko Mining Corporation, a leader in exploration and mining in Quebec, inaugurated the Canadian Malartic gold mine, a large-scale open-pit mine located in Malartic, Abitibi. Osisko estimates it will extract more than 9 million ounces of gold from now until 2027.

Osisko chose to partner with Victaulic system solutions on applicable systems within the mine. A major component of this project was the need to reliably join large diameter systems up to 54″/1300mm. The Victaulic Advanced Groove System (AGS) was selected as the ideal application to meet the demanding requirements of this job for its strength and ease of installation. Victaulic AGS couplings provided streamlined and easy installation while allowing for visual inspection of the proper joint assembly. These benefits were realized on the process water and chemical systems, along with the rubber-lined pipe use in slurry applications.

Victaulic system solutions maximized onsite installation schedules while mitigating risk on the process air, process water, and chemical systems. Victaulic also provided fire protection solutions throughout the mine. Partnering with Victaulic enabled Osisko to meet their demanding construction timeline and increased onsite safety throughout the installation.