Permian Basin Production Facility Project

Permian Basin Production Facility project
Wastewater Icon

项目概况

项目类型:
生产设施
业主:

顾问公司设计院:

承包商:

管道材料:

碳钢

管道尺寸:

2’’ - 12’’

位置:

Permian Basin

解决方案:

  • 项目建模与设计
  • 压缩项目工期
  • Coordinated Delivery
  • 安装便捷
  • 现场培训与支持

When a customer is in need of fabrication services, Victaulic partners to deliver customized solutions to meet the unique project requirements. This was showcased on a recent project in the Permian Basin. The project consisted of 2’’ – 12’’ carbon steel, internally plastic coated, HPDE, and FRP pipe on the multi-tank production facility. The customer lacked the resources required to complete the construction drawings with their in-house design team and partnered with Victaulic for help.

Victaulic’s in-house modeling team worked closely with the customer to design and deliver construction drawings according to the project’s unique build strategy. Deliveries were broken into 4 zones to avoid excess material onsite, streamlining material handling and reducing laydown area.

Victaulic’s total project partnership enabled the customer to mitigate risk and maximize productivity onsite. The equated to schedule and cost certainty, bringing the facility online on time and on budget.

项目类型:
生产设施
Wastewater Icon
业主:

顾问公司设计院:

管道材料:

碳钢

位置:

Permian Basin

承包商:

管道尺寸:

2’’ - 12’’

解决方案:

  • 项目建模与设计
  • 压缩项目工期
  • Coordinated Delivery
  • 安装便捷
  • 现场培训与支持

When a customer is in need of fabrication services, Victaulic partners to deliver customized solutions to meet the unique project requirements. This was showcased on a recent project in the Permian Basin. The project consisted of 2’’ – 12’’ carbon steel, internally plastic coated, HPDE, and FRP pipe on the multi-tank production facility. The customer lacked the resources required to complete the construction drawings with their in-house design team and partnered with Victaulic for help.

Victaulic’s in-house modeling team worked closely with the customer to design and deliver construction drawings according to the project’s unique build strategy. Deliveries were broken into 4 zones to avoid excess material onsite, streamlining material handling and reducing laydown area.

Victaulic’s total project partnership enabled the customer to mitigate risk and maximize productivity onsite. The equated to schedule and cost certainty, bringing the facility online on time and on budget.