Pilgangoora – Pilbara Minerals

Pilbara Minerals Plant utilizing the fastest pipe joining method & reliable, Vic-Press & QuickVic solutions
Wastewater Icon

项目概况

项目类型:
锂矿和加工厂
业主:

Pilbara Minerals

顾问公司设计院:

Minnovo

承包商:

RCR

管道材料:

碳钢,壁厚 10 不锈钢,橡胶衬里

管道尺寸:

1/2 - 32"

位置:

西澳大利亚黑德兰港

解决方案:

  • 压缩施工工期
  • 安装便捷
  • Speed of Installation

Pilbara Minerals’ Pilgangoora Lithium-Tantalum Project, located near Port Hedland in Western Australia’s resource-rich Pilbara region, is one of the largest new lithium ore deposits in the world.

With an aggressive deadline to begin operations, Victaulic® products were chosen to provide the fastest pipe joining method across a range of services and pipe materials from 1/2” to 32” (15mm – 800mm). For the small bore stainless steel chemical and compressed air lines, Victaulic Vic-Press™ provided a fast and simple joining solution that enabled the site to use off-the-shelf Schedule 10 stainless. Likewise, on the standard weight carbon steel systems, Victaulic system solutions provided safe and efficient installation. With Installation-Ready™ couplings, the process water and compressed air lines were joined up to 10 times faster than alternative methods. Victaulic was able to provide solutions for the full range of sizes up to 32” (800mm), including rubber-lined carbon steel pipe.

Ultimately, a post-construction analysis calculated a two to three-month savings on construction time and a savings of roughly $1 million in labor costs.

Partnering with Victaulic enabled Pilbara Minerals to mitigate risk, maximize productivity, and enhance onsite safety.

项目类型:
锂矿和加工厂
Wastewater Icon
业主:

Pilbara Minerals

顾问公司设计院:

Minnovo

管道材料:

碳钢,壁厚 10 不锈钢,橡胶衬里

位置:

西澳大利亚黑德兰港

承包商:

RCR

管道尺寸:

1/2 - 32"

解决方案:

  • 压缩施工工期
  • 安装便捷
  • Speed of Installation

Pilbara Minerals’ Pilgangoora Lithium-Tantalum Project, located near Port Hedland in Western Australia’s resource-rich Pilbara region, is one of the largest new lithium ore deposits in the world.

With an aggressive deadline to begin operations, Victaulic® products were chosen to provide the fastest pipe joining method across a range of services and pipe materials from 1/2” to 32” (15mm – 800mm). For the small bore stainless steel chemical and compressed air lines, Victaulic Vic-Press™ provided a fast and simple joining solution that enabled the site to use off-the-shelf Schedule 10 stainless. Likewise, on the standard weight carbon steel systems, Victaulic system solutions provided safe and efficient installation. With Installation-Ready™ couplings, the process water and compressed air lines were joined up to 10 times faster than alternative methods. Victaulic was able to provide solutions for the full range of sizes up to 32” (800mm), including rubber-lined carbon steel pipe.

Ultimately, a post-construction analysis calculated a two to three-month savings on construction time and a savings of roughly $1 million in labor costs.

Partnering with Victaulic enabled Pilbara Minerals to mitigate risk, maximize productivity, and enhance onsite safety.