南部海域水务管理局珀斯 2 号海水淡化厂

Wastewater Icon

项目概况

项目类型:
海水淡化
业主:

南部海域水务管理局 (SSWA)

顾问公司设计院:

Tecnicas Reunidas

承包商:

Tecnicas Reunidas

管道材料:

超双相不锈钢

管道尺寸:

2” – 16”

位置:

澳大利亚海军基地

解决方案:

  • 最大程度地缩短周期
  • 提供确定性
  • Speed of Installation

The Southern Seawater Authority Perth 2 Desalination Plant was designed to support the greater Perth Region of Western Australia. The plant was constructed to support the increase in water consumption that was created through population growth and reduced rainfall.

南部海域水务管理局需要找到一种解决方案,以缩短正在建造的工厂项目工期,为西澳大利亚州的用水生产任务提供支持。Victaulic 的沟槽管道产品和解决方案能够缩短项目工期、减少劳动力并降低工厂成本。

Victaulic 的虚拟设计和施工团队向 SSWA 建议将焊接接头、法兰接头和阀门组件换成 Victaulic 沟槽管道解决方案。该解决方案包括用于高压薄壁超双相不锈钢管道的 StrengThin™ 系统。Victaulic 解决方案还可以用于高压反渗透系统。

The rapid field assembly of the StrengThin system and Victaulic high-pressure plug valves dramatically reduced field man-hours and assisted in creating schedule certainty. The total field installation time for a complete 16″ | DN400 valve assembly was reduced from 2½ days to 10 minutes.

The Southern Sea Water Authority Perth 2 Desalination Plant has the potential to deliver 30% of the state’s water supply from climate independent water sources.

项目类型:
海水淡化
Wastewater Icon
业主:

南部海域水务管理局 (SSWA)

顾问公司设计院:

Tecnicas Reunidas

管道材料:

超双相不锈钢

位置:

澳大利亚海军基地

承包商:

Tecnicas Reunidas

管道尺寸:

2” – 16”

解决方案:

  • 最大程度地缩短周期
  • 提供确定性
  • Speed of Installation

The Southern Seawater Authority Perth 2 Desalination Plant was designed to support the greater Perth Region of Western Australia. The plant was constructed to support the increase in water consumption that was created through population growth and reduced rainfall.

南部海域水务管理局需要找到一种解决方案,以缩短正在建造的工厂项目工期,为西澳大利亚州的用水生产任务提供支持。Victaulic 的沟槽管道产品和解决方案能够缩短项目工期、减少劳动力并降低工厂成本。

Victaulic 的虚拟设计和施工团队向 SSWA 建议将焊接接头、法兰接头和阀门组件换成 Victaulic 沟槽管道解决方案。该解决方案包括用于高压薄壁超双相不锈钢管道的 StrengThin™ 系统。Victaulic 解决方案还可以用于高压反渗透系统。

The rapid field assembly of the StrengThin system and Victaulic high-pressure plug valves dramatically reduced field man-hours and assisted in creating schedule certainty. The total field installation time for a complete 16″ | DN400 valve assembly was reduced from 2½ days to 10 minutes.

The Southern Sea Water Authority Perth 2 Desalination Plant has the potential to deliver 30% of the state’s water supply from climate independent water sources.