QUICKVIC™ SD HVAC CASE STUDY:
THAMESVIEW APARTMENTS

APARTMENT BUILDING UPGRADE BENEFITS TENANTS

LOCATION:
  • 加拿大安大略省查塔姆
FACILITY TYPE:
  • 高层住宅
PROBLEM:
  • 新锅炉系统的安装时间长
  • 传统螺纹安装的空间有限
  • 传统螺纹安装的混乱和麻烦
Benefits of QuickVic™ SD
  • 安装方便、安装速度块
  • Simplified maintenance
  • Labor savings
Read On
In November 2018, Postma Heating & Cooling upgraded the boiler in the mechanical room at the Thamesview Apartments in Chatham, Ontario. To date, their standard process for joining small diameter carbon steel pipe was threading. This typically took about three days and required an onsite threading machine. However, prior to this project, the contractor was introduced to a new small diameter piping innovation - the Victaulic QuickVic™ SD Installation-Ready™ System. Offering an easier, faster way to join carbon steel pipe compared to threading, the contractor decided to try QuickVic SD for the Thamesview Apartments project. Installation was simple, without the space needed or the mess caused by threading. Pipe was cut, prepared and marked, and then inserted into a QuickVic SD housing. Using a standard impact wrench, the bolts were tightened until visual pad-to-pad contact was achieved. A full offering of couplings, fittings and valves allowed for a complete system install. Celeb Postma, a technician at Postma Heating & Cooling, comments, “Postma expects QuickVic SD to be a go-to solution moving forward. We will definitely use it on future projects and carry it in our truck. It will be great for system builds and repairs. The fast installation and easy system access for maintenance makes it a winner for our business.”
Using Victaulic enabled us to install the complete boiler piping system in half the time with less labor, elbow grease and equipment. Less joints were needed, and we really liked how easy it was to make changes. We forgot a valve on one section, but adding it in took minimal time with no wasted material.
—Celeb Postma,Postma Heating & Cooling 技术员
SERVICES
Hot Water
管道材料
Schedule 40 Carbon Steel
PIPE SIZE RANGE
1½ – 2"/DN40 - DN50
OWNER
Thamesview Apartments
CONTRACTOR
Postma Heating & Cooling Inc.
ENGINEER/CONSULTANT
Simep Dominicana S.R.L.
DISCOVER HOW QUICKVIC™ SD CAN BENEFIT YOUR NEXT PROJECT
了解更多

CHECK OUT MORE PROJECTS AND CLIENTS THAT HAVE BENEFITTED FROM QUICKVIC™ SD INSTALLATIONS

HOTEL IMPROVEMENTS FOR BETTER GUEST EXPERIENCES
  • Ease & Speed of Installation
  • Time Savings
  • 保养维修更简单
了解更多
UNIVERSITY EXPANDS ITS TEACHING LABS
  • 节省成本
  • Ease and Speed of Installation
  • Ease of Rework
了解更多
DISCOVER HOW QUICKVIC™ SD CAN BENEFIT YOUR NEXT PROJECT
了解更多