TOPIC: Case Studies

Nebraska community center chooses Victaulic mechanical couplings as its HDPE joining method for the Geothermal HVAC System project

HDPE Joins Geothermal HVAC System for a Passion Project

Nebraska community center celebrates timely opening after choosing a mechanical solution as its HDPE joining method on the project.

中央火车站 VDC 图片 – Victaulic(唯特利)3D 激光扫描,包含 3D 管道建模;扫描摄像头管道

扫描到 BIM 加快了拥有上百年历史的翻新项目的进度

Learn how Victaulic’s scan to BIM process expedited construction on a 100-year-old train station.

414 Light Street in Baltimore, Maryland

BIM 软件专业知识帮助 Poole & Kent 项目提前竣工

Find out how Victaulic’s BIM software expertise Virtual Design and Construction (VDC) team helped Poole & Kent finish HVAC infrastructure installment.

Red medical kit in life preserver

HDPE Couplings Rescue a Landfill’s Failed Fusion Welds

Gas is extracted with vertical wells & vacuum system then transported to gas-to-energy plant via HDPE pipe before being converted into power.

梅赛德斯-奔驰体育馆,佐治亚州亚特兰大 - Victaulic(唯特利)创新管道解决方案

Innovative Piping Solutions Win Big at Mercedes-Benz Stadium

Victaulic innovative stadium piping solutions helped Tebarco Mechanical accommodate tight timelines and unique architecture at Mercedes-Benz Stadium.

Victaulic HDPE Mechanical Pipe Joining System Solution mechanical joints designed & tested to withstand pipe movement caused by temperature fluctuations

How can Victaulic Products Help HDPE Pipe Beat the Heat?

When the Glencore Oaky Creek coal mine was set to install an 8km, large-diameter HDPE raw water pipeline Glencore chose a new pipe joining method.

WWII Plane

Petroleum Handling Pass-Off

Pipe couplings have been used on petroleum pipe lines for fuel distribution since World War II.

Construction Workers - Shinn Tunnel

Piping Partnership Helps Contractor Finish Project in 10 Weeks

Partnering with Milwaukee & Victaulic, Shinn Mechanical installed, tested & completed a piping system in Seattle SR 99 tunnel in 10 weeks.